Most machinery orders from China go smoothly, but problems do happen: a machine arrives damaged, a part is missing, the output is lower than promised, or the machine fails soon after installation. How you respond in the first days often decides whether the problem gets fixed quickly. This guide explains how to build a clear claim, work with the supplier toward a solution, and set up your next order so disputes are less likely.
Common types of machinery problems
- Transport damage: bent frames, broken panels, damaged control cabinets or loose parts caused during loading, sea freight or inland transport.
- Missing items: spare parts, tools, accessories or documents not in the crates.
- Specification differences: wrong voltage, different component brands, smaller motors or thinner steel than agreed.
- Performance shortfall: capacity, accuracy or product quality below the contract.
- Early failures: breakdowns of motors, electronics, seals or hydraulics during the warranty period.
Step 1: Document everything immediately
- Photograph and film the container before opening, during unloading and while uncrating.
- Note any damage on the delivery receipt before signing, and tell the carrier in writing as soon as possible.
- Compare the contents with the packing list and contract, item by item.
- For performance problems, record test conditions: raw material, settings, power supply, operator, and measured output.
- Keep alarm screens, error codes and photos of nameplates.
If the cargo was insured, contact the insurer or its agent before repairs, because they may want to survey the damage. See our guide on marine cargo insurance for machinery.
Step 2: Check your contract and records
- Technical specification, component brands and performance figures in the contract or its annexes.
- Warranty terms: period, what is covered, response time and who pays for parts, shipping and engineer visits.
- Inspection or acceptance records: a signed factory acceptance test report is strong evidence of what the machine did before shipment.
- Incoterm: it decides who bore the transport risk and therefore who claims against the carrier or insurer. See our Incoterms guide.
- Dispute resolution clause: negotiation, mediation, arbitration body and governing law.
If your contract is weak on these points, our article on machinery purchase contracts explains what to include next time.
Step 3: Send a clear, written claim
- Write to the supplier’s responsible salesperson and manager, in English, and if possible with a Chinese translation.
- List each problem separately with photos, videos and the contract clause it relates to.
- State the remedy you want: replacement parts, remote troubleshooting, an engineer visit, a price reduction or a refund of a specific amount.
- Give a reasonable deadline for a reply.
- Keep the tone factual. Suppliers respond better to clear evidence than to general complaints.
Step 4: Work toward a practical solution
- Many problems can be solved remotely by video call, with the supplier’s engineer guiding your technician. Prepare stable internet and a person who can follow instructions.
- For missing or failed parts, ask for express shipment and agree who pays the freight and duty.
- If an engineer visit is needed, agree in writing on travel costs, visa timing and the work scope.
- If the machine cannot reach the contract performance, negotiate a partial refund, an upgrade or a credit on the next order, and record the agreement in writing.
- Pay attention to cultural and practical factors: holidays such as Chinese New Year can slow responses, and decisions often need the owner or general manager.
Step 5: Escalate if needed
- If you paid by letter of credit or through a platform with trade assurance, check the platform’s dispute process and time limits.
- Formal arbitration is possible if your contract includes an arbitration clause, but it takes time and cost. It is usually a last resort for larger amounts.
- A local agent or partner in China can visit the factory, meet the management and help resolve the issue face to face.
How to prevent disputes on your next order
- Use a detailed technical specification and approved drawings. See drawing and layout approval.
- Link payment to milestones, keeping a meaningful balance until after testing. Our guide to payment terms explains common structures.
- Inspect during production and before shipment, and witness a test run with your own material if possible.
- Check crating, fixing and moisture protection before loading. See shipping machinery from China.
- Agree on warranty and after-sales terms in advance; see our article on warranty and after-sales service.
- Order a recommended spare parts kit with the machine.
Frequently asked questions
Who pays for transport damage?
It depends on the Incoterm and the insurance. Under FOB or CIF, risk usually passes to the buyer once goods are loaded on the vessel, so the claim is normally against the insurer or carrier, not the supplier, unless poor packing caused the damage.
How long do I have to make a claim?
Check your contract, the carrier’s terms and the insurance policy. Time limits can be short, so report problems in writing as soon as you find them.
Can I return a machine to China?
It is possible but usually expensive and slow, because of freight, duties and paperwork. Repair on site, replacement parts or a price adjustment are more common solutions.
Source machinery with Supbon Sourcing
Supbon Sourcing is a China machinery sourcing agent based in Jinan, Shandong. We help buyers set clear specifications, check suppliers, inspect machines before shipment, and communicate with factories in Chinese when problems need solving. Learn more about our machinery sourcing in China service, or contact us to discuss your order.