A machine is only as useful as the information that comes with it. Many buyers focus on price, specification and delivery, then discover after arrival that the operating manual is thin, the electrical drawings are missing, or the PLC program is locked. Fixing this later is slow and sometimes impossible. This guide lists the technical documents you should request from Chinese machinery suppliers, and how to make sure you actually receive them.
Why documentation matters
- Your technicians need it to install, operate and maintain the machine safely.
- Customs, certification bodies and insurers may ask for technical data.
- Spare parts are much easier to order when you have exact part numbers and brands.
- If the original supplier becomes slow to respond, good documentation lets local engineers support the machine.
Core documents to request
- Operating manual in English (or your language): start-up, operation, shutdown, settings and common faults.
- Maintenance manual: lubrication points and intervals, inspection routines and wear part replacement steps.
- Installation guide: foundation drawing, anchor bolt positions, utility connection points, lifting points and assembly sequence.
- General arrangement drawing: overall dimensions, weight and layout, especially for lines.
- Electrical schematics: wiring diagrams, terminal lists and the control cabinet layout.
- Hydraulic and pneumatic diagrams where relevant, with valve and cylinder specifications.
- Spare parts list: part names, drawing or part numbers, brands and models of bought-in components, and recommended stock quantities.
- Component documentation: manuals for major bought-in parts such as inverters, PLCs, servo drives, burners and pumps.
Software, programs and passwords
- Ask whether you will receive a backup of the PLC and HMI program, and in what form.
- Confirm that no time-limited password or lock is installed. Some buyers have found machines that stop after a set period until a code is entered. Write this into the contract.
- For CNC machines, request parameter backups and the control system manuals.
- Agree on remote support access, if any, and how it is controlled.
Certificates and compliance documents
- Test or inspection report from the factory, ideally linked to your factory acceptance test.
- Material certificates for critical parts, such as pressure vessel steel or food-contact stainless steel, where needed.
- CE documentation if your market requires it: Declaration of Conformity and the information that supports it. See our CE marking guide.
- Nameplate data: model, serial number, year, voltage and power, matching the commercial documents.
- Shipping documents: commercial invoice, packing list and certificate of origin if required. Our guide to customs clearance documents covers these.
How to write documentation into the contract
- List every required document by name in the contract or a technical appendix, not just “manual included”.
- State the language, format (PDF and printed copy) and delivery timing, for example draft before shipment and final copy with the machine.
- Link part of the balance payment to receiving complete documents.
- Our guide on the machinery purchase contract explains other clauses to include.
Checking documents before shipment
- Request draft manuals and drawings during production so you have time to review them.
- Compare electrical drawings with the actual control cabinet during inspection.
- Check that component brands in the parts list match what is installed.
- Confirm the English is understandable. Machine translation that nobody can follow is a real problem on site.
- Make sure a printed set is packed with the machine and a digital set is sent to you separately.
Common problems and how to avoid them
- Generic manuals: a brochure-style manual for a whole product range. Ask for a manual specific to your model and options.
- Missing electrical drawings: some suppliers are reluctant to share them. Make them a contract requirement from the start.
- Undefined spare parts: “bearing” or “seal” without a size or brand. Insist on specific part data.
- Late documents: documents promised “after shipment” often arrive slowly. Request them before the final payment.
Good documentation also makes installation and commissioning and future spare parts sourcing much easier.
Frequently asked questions
Will a Chinese supplier provide electrical drawings?
Many will, especially when it is agreed before the order. It is harder to get them after the balance is paid, so include them in your RFQ and contract.
Can I ask for manuals in a language other than English?
Yes, but confirm whether the supplier can provide it and who pays for translation. Many buyers accept English from the supplier and arrange local translation themselves.
What should I do if documents are missing after delivery?
Contact the supplier quickly with a clear list of what is missing, citing the contract. This is much easier if part of the payment or warranty terms is linked to documentation.
Get complete machinery documentation with Supbon Sourcing
Supbon Sourcing is a China machinery sourcing agent based in Jinan, Shandong. When we manage a purchase, we help buyers define the required documents in the RFQ and contract, follow up with the factory and check manuals and drawings during inspection. Learn more about our machinery sourcing in China service.
Contact Supbon Sourcing to discuss your next machinery purchase and the documents you need with it.