A machine that passes inspection in China still has to be installed, connected, adjusted and handed over at your site. Many import problems appear at this stage: an engineer whose visa is delayed, a floor that is not ready, or a voltage that does not match. Installation and commissioning should be planned at the same time as the purchase, not after the container sails. This guide explains how importers and factories can arrange the work with Chinese suppliers, whether through a machinery sourcing project or a direct order.
Installation options
- Self-installation with manuals and video: suitable for simple, standalone machines where your team already has experience.
- Remote commissioning: supplier engineers guide your technicians through video calls and remote PLC access where available. This can work well if your team is capable and the site has reliable internet.
- Supplier engineer visit: one or more engineers travel to your site to supervise installation, tune the machine and train operators.
- Local service partner: a local integrator or dealer installs the equipment using supplier support.
- Trial assembly in China: your team or representative learns the machine during factory acceptance testing, which shortens work at site.
What to put in the contract
Vague phrases such as “installation included” cause disputes. Your machinery purchase contract should state:
- Whether the supplier supervises installation or performs all of the work.
- The number of engineers, their skills and the number of working days included.
- Who pays airfare, visas, hotels, meals, local transport and daily fees, and the rate for extra days.
- What the buyer must provide: lifting equipment, labour, tools, utilities, interpreter and materials.
- Training content, duration and language.
- Definition of acceptance, such as output, quality and running time.
- What happens if commissioning is delayed by either side.
- How any payment tied to acceptance is released. See our guide on machinery payment terms.
Preparing your site
Most delays are caused by a site that is not ready. Before the engineer arrives, confirm:
- Foundation drawings have been followed, and concrete has cured for the time specified.
- Power supply, voltage, frequency, phase rotation and earthing match the machine.
- Compressed air, water, steam, gas and drainage are connected and meet the required flow and pressure.
- There is enough height and access to bring the machine in and to open doors and service panels.
- Lifting equipment and riggers are booked.
- Raw materials for trial production are on site and to specification.
- Local permits, safety inductions and any required inspections are arranged.
Arranging engineer travel
Visa processing times vary widely by country and may take weeks, so start early. Prepare an invitation letter, and check whether a business or work visa applies to installation work in your country, because the rules differ. Agree working hours, public holidays, accommodation and safety equipment beforehand. Remember that engineers may be unavailable around Chinese New Year. If the language barrier is significant, arrange an interpreter who is comfortable with technical terms.
Safety during installation
- Follow local workplace safety law, and make sure visiting engineers receive a site induction.
- Lock out electrical and stored energy sources before working on equipment.
- Use certified lifting gear and qualified operators.
- Do not bypass guards or interlocks for convenience, and do not accept a machine handed over with them disabled.
- Have your safety officer review the machine against local requirements, such as CE marking rules in Europe.
Commissioning step by step
- Unpack and check all items against the packing list, photographing any damage immediately.
- Position, level and fix the machine as instructed.
- Connect utilities, then verify them before applying power.
- Check rotation direction, sensors, alarms and emergency stops.
- Run the machine empty, then at low speed, then at production speed.
- Run trial production and measure output and quality against the agreed targets.
- Train operators and maintenance staff, and record who attended.
- Sign an acceptance report listing any open items and deadlines.
If you find shipping damage or shortages, follow the steps in our article on what to do when a machine arrives damaged or defective, and notify the insurer quickly. For background on freight, see shipping machinery from China.
After handover
Keep a record of final parameters, backup copies of PLC and HMI programs where the supplier can provide them, and the as-built electrical drawings. Set up a spare parts list and a communication channel for technical questions. Our guide to machinery warranty and after-sales service explains what to agree on response times and parts.
Frequently asked questions
Is installation by a Chinese engineer usually free?
It depends on the contract. Suppliers commonly charge daily fees and ask the buyer to pay travel and accommodation, although some include a set period. Get the terms in writing before you order.
Can machinery be commissioned remotely?
For many standalone machines, yes, if your technicians are capable and connectivity is good. For complex lines or new processes, an on-site engineer is usually safer. Consider a combination of both.
When should the final payment be made?
Many machinery orders are paid in full before shipment, while larger projects may hold back a portion until acceptance on site. This is negotiable, so agree the milestone clearly in the contract.
Source and commission machinery with Supbon Sourcing
Supbon Sourcing is a machinery sourcing agent in Jinan, Shandong. We help overseas buyers clarify supplier responsibilities during purchasing, including installation and training terms, and can support custom industrial equipment projects. Contact us with your machine type, destination and installation needs.